• pl
  • en
Trinecky Inzenyring a.s.
11.2013 - 11.2015
Delivery and erection works on Trinecke Zelezarny a.s. Steel plant secondary dedusting

Scope of works:

  • delivery and erection of 450 T supporting steel structure for air bag filters;
  • delivery of 1000 T of piping and supporting steel structures;
  • complete erection of 3000 T of technological steel structures, air piping of big dimensions, air bag filter;
  • complete transport and storage logistics at site for complete site delivery.
Zakłady Azotowe "Kędzierzyn" S.A. (nitrogen works)
2012 - ...
Erection of the liquid ammonia tank with a double shell V = 22500 m3, which is 15000 ton

The subject works were carried out professionally, on time and in accordance with all the technical requirements or OH&S rules.

Ruukki Polska Sp. z o.o.
11.2011 - 9.2012
Extension of the STORA ENSO paper mill in Ostrołęka
  • Fabrication and erection of the steel structures, assembly of the cladding.
  • Fabrication and delivery of approx. 100 tons of steel structures
  • Erection of 3000 tons of steel structures and 28000 sq m of roof trapezoidal sheet
Lhoist Polska Sp. z o.o.
7.2011 - 12.2011
Extension of the Hydrated Lime Plant in the area of the Production Unit in Górażdże
  • Fabrication with a corrosion protection, erection of a steel structure, workshop documents, complete flashings, gutter system, cladding and joinery installation;
  • Thermal insulation of silos in the units no 12 and 40;
  • Bag filter installation in the unit no 2
Aker MH AS, Norway
2011 - ...
Delivery of complete structure for two Drilling Derricks

"The Derrick Structures have been completed on time to agreed quality and cost. The quality has been confirmed by the assembling contractors as the structures have fitted very well together."

Ruukki Polska Sp. z o.o.
11.2010 - 12.2011
Construction of the biomass power unit - Połaniec power plant (Green Unit project) - GDF SUEZ Energia Polska S.A.
  • Fabrication and erection of the steel structures
  • Fabrication and delivery of approx. 150 tons of steel structures
  • Installation of 4800 tons of steel structures
Rafako S.A.
3.2010 - 10.2010
Complete disassembly of the old one and assembly of the new ESP, flue gas ducts, ash removal system (electric, mechanical parts and Control and Measurement Instruments and Automation) of the unit no 10 in Kozienice S.A. power plant
Euroglas Polska Sp. z o.o.
2.2010 - ...
Execution of a wide range of prefabrication and installation works during the erection of glass factory in Ujazd

The scope of work included:

  • fabrication and pre- assembly of silos at the build site, installation at the height of 15 m - weight: between 4 and 48 tons, total weight: 380 tons;
  • prefabrication and erection of the steel structures for the following units: batch house ( H= 45 m, total area: 40,5m x 17,5 m), furnace feeder, a set of conveyors - total weight: 750 tons;
  • assembly of the technological devices for the loading system, dosing system, weighing, transportation of the material to the furnace and cullet return system;
  • delivery and installation of the light cladding - 800 m2;
  • complete installation of the electrical wiring and control system
Chemprojekt a.s.
2010 - ...
Nitric and Ammonium Nitrate Plant Project for ZAK S.A.

"Our co-operation within the a/m Project allows us to recommend the Mostostal Kędzierzyn S.A. company as a reliable partner to perform the Works as a Mechanical Contractor of the similar industrial projects"

Bipromet
15.7.2009 - 15.12.2009
Modernization of the ESP of the sintering belt SP-5 in the Arcelor Mittal Steelworks in Ostrava

The scope of work included:

  • dismantling of the equipment of the interior ESP;
  • change of the chamber's walls  affected by corrosion;
  • assembly of the new equipment of the interior ESP;
  • participating in the functional tests and commissioning.